PROJECT CASE STUDIES
Delta Pyramax
Kai Tak Sports Park improved sustainability and efficiency by using 112,250 HF2-CN8G-2M wire rope hangers, cutting 12,271.5 kg of CO₂ vs. M8 rods and enabling installs 6× faster, saving labor costs and reducing environmental impact.
PROJECT CASE STUDIES
Delta Pyramax
For this project at Sentosa, Singapore, a total of 302,746 kg (302 tonnes) of prefabricated 3D curved planter walls were produced, consisting of 1,007 unique pieces.
PROJECT CASE STUDIES
Delta Pyramax
Kai Tak Sports Park, Hong Kong’s largest sports infrastructure, includes a 50,000-seat stadium, a 10,000-seat arena, and a 5,000-seat sports ground. It uses Monodraught Windcatcher systems for natural ventilation and enhancing airflow.
OTHER
Rockfon
Dyson’s new Singapore Headquarters at St James Power Station is a bold fusion of heritage and innovation.
NEWS
Armada
* Super Clear Image with More Details
* Self- pwered and Networked, No Extra Wiring Needed
* Dual Installation, Flexible Setup
* Multiple Working Modes as Needed
* Ultra-low Power Usage, Always-on Recording
* Incrediby Accurate and Instant Alerts
NEWS
Delta Pyramax
This year, Delta Pyramax is announcing launch of their latest advancements in Green GRC™, reflecting their commitment to sustainability and 30 years of industry experience with GRC.
PROJECT CASE STUDIES
Rockfon
See how workplaces like Zaha Hadid’s SKY PARK in Bratislava and Gensler’s ARK refurbishment in London creatively tackled structural challenges to craft standout ceilings and enhance acoustics.
EDUCATION
Armada
Automatic Attendance Spare More Time on Teaching and Learning
PROJECT CASE STUDIES
Delta Pyramax
Hotel Lisboa in Macau is renovating their West Wing suites area; to catch up progress and solve labour shortage Hotel Lisboa decided to use “Press-fitting technique” to connect water pipes in suites area with over 400 hotel rooms.