Updates
NEWS
WuduMate
We are pleased to announce that WuduMate has achieved the International Quality Standard ISO9001 in January 2025.
PROJECT CASE STUDIES
Delta Pyramax
Kai Tak Sports Park improved sustainability and efficiency by using 112,250 HF2-CN8G-2M wire rope hangers, cutting 12,271.5 kg of CO₂ vs. M8 rods and enabling installs 6× faster, saving labor costs and reducing environmental impact.
PROJECT CASE STUDIES
Delta Pyramax
For this project at Sentosa, Singapore, a total of 302,746 kg (302 tonnes) of prefabricated 3D curved planter walls were produced, consisting of 1,007 unique pieces.
PROJECT CASE STUDIES
Delta Pyramax
Kai Tak Sports Park, Hong Kong’s largest sports infrastructure, includes a 50,000-seat stadium, a 10,000-seat arena, and a 5,000-seat sports ground. It uses Monodraught Windcatcher systems for natural ventilation and enhancing airflow.
PROJECT CASE STUDIES
Fosroc
In conjunction with the HK$7 billion-plus Racecourse Master Plan project of the Shatin Racecourse, Hong Kong Jockey Club
PROJECT CASE STUDIES
Fosroc
AIRSIDE: Grade A office and a multi-storey retail complex with an interconnected underground shopping street.
PROJECT CASE STUDIES
Fosroc
Located in Sha Tin Racecourse, the 5-storey building with 2 levels of basement occupies 28,000sq ft of land area.
PROJECT CASE STUDIES
Fosroc
HSBC Data Centre Tseung Kwan O was built in 2008.
PROJECT CASE STUDIES
Fosroc
The boundary control point with direct access facilities, a 450-space public carpark, a public transport interchange.
PROJECT CASE STUDIES
Fosroc
Ocean Park Water World project includes construction of the theme world for various indoor and outdoor water attractions.