27 Aug 2026 by Bona
Easington Park, a historic wedding and events venue in Gloucestershire, needed to refresh approximately 350m² of heavily used timber flooring without disrupting its busy events schedule. Bona Certified Contractor ATC Floors & Doors recommended the Bona Silver Renovation System, avoiding the need for a full sand back to bare wood. The floor was deep cleaned with the Bona PowerScrubber, mechanically prepared using Bona Scrad Pads and Diamond Wings, then recoated with Bona Traffic HD, with Bona Anti Slip Additive used in the busy bar area for enhanced slip resistance. Completed in just two days, the renovation restored the floor’s appearance and durability, extended its service life, and allowed the venue to return to full operation the following day—providing a fast, cost-effective and sustainable solution with minimal downtime.