Updates
PROJECT CASE STUDIES
Ventuer
An iconic Auckland building, the famous curved, landscaped balconies enjoy one of the prime positions in Mission Bay.
PROJECT CASE STUDIES
WOODCUT
An elevated space selling high-end mattresses, this Armadale showroom is nothing short of luxurious. Complete with our premium engineered timber flooring in both White Smoked and Carbonised Oak, our timber evokes a feeling of calm, perfect for creating an environment when shopping for a blissful night's sleep.
NEWS
Construction Specialties
Last night, a series of four storms wreaked havoc across NSW, leaving over 140,000 people without power! Wind-driven storms are notorious for their relentless horizontal rain, which leaves electrical systems that aren't properly safeguarded vulnerable to water damage.
NEWS
Billi Australia
On top of ISO 9001, Billi Australia is now proud to also be officially ISO 14001 (Environmental) and ISO 45001 (Health & Safety) certified!
NEWS
KONE Elevators
Sometimes a simple innovation – like a plastic crate – can make a big difference. When service technicians voiced concern over the amount of packaging materials they had to return after every shift, KONE Netherlands found a way to reduce both waste and greenhouse gas emissions, while also saving time and money.
PROJECT CASE STUDIES
DCTech / Proctor Group
Macquarie Centre
PROJECT CASE STUDIES
DCTech / Proctor Group
Aldi Supermarket Katoomba
PROJECT CASE STUDIES
DCTech / Proctor Group
Bureau of Meteorology Project Bureau of Meteorology Location Melbourne, VIC Application Retrofit car park soffit with PIR thermal insulation Product Dow PIR Tuff-R 32mm
PROJECT CASE STUDIES
REGUPOL Australia
The Munn Ice Arena at Michigan State University prioritized safety in its state-of-the-art hockey facility. To implement this, the training facility uses a roll of REGUPOL aktivpro across a 3,200-square-foot area within a larger 35,000-square-foot renovation.
PROJECT CASE STUDIES
REGUPOL Australia
At Seestadt Aspern Campus in Austria, REGUPOL sound and drain 22 impact sound insulation was installed under the terrace areas.