
Transforming Spaces: How Mario Romano Walls Redefines Interior Design with Textured Surfaces
In the realm of wall finishes, traditional decoration methods often rely on painting to cover large interior spaces in both residential and commercial projects. However, Mario Romano Walls breaks from convention by introducing textured surfaces that add depth and dimension.

Wurun Senior Campus, VIC
Nestled in the heart of Fitzroy, Victoria, the Wurun Senior Campus stands as a beacon of modern architectural ingenuity, winning the prestigious title of Best Secondary School at the esteemed 2022 Victorian School Awards.
Our Insightful Articles
PROJECT
2 YEARS AGO
Completed in June 2017, a new Sydney Seaplane terminal brings the beloved back to Rose Bay. PENETRON ADMIX was used in the precast elements to ensure impermeability for a structure built wholly over seawater.
PROJECT
2 YEARS AGO
The SANICUBIC 1: An integral part of Joost Bakker’s future food system, Greenhouse.
PROJECT
2 YEARS AGO
One of the most exciting developments in architecture is the resurgence of timber and the innovative construction of tall wooden buildings.
PROJECT
2 YEARS AGO
The Chapman Tripp office space is so much more than just a commercial building. Inside and out, the structure is a pinnacle of inspiring design work. Situated in the heart of Wellington, this stunning workplace features a modern blend of private spaces and a flexible open floor plan supported by the latest technological advances.
PROJECT
2 YEARS AGO
Kerakoll would like to share their driven commitment to sustainable growth “There is no value in industrial success if there is no commitment to sustainable development.” Kerakoll has achieved excellent results, the best ever, actually – confirming and boosting all their projects.
PROJECT
2 YEARS AGO
A prestigious new Sydney residential apartment development has been fitted with Doric’s new award-winning Ventus automated ventilation system.
PROJECT
2 YEARS AGO
The new Arncliffe Youth Centre, providing a local community hub for Sydney’s southern suburbs, is now completed.
PROJECT
2 YEARS AGO
Truly an undeniable transformation from start to finish with this added gas fireplace feature to the home!
PROJECT
2 YEARS AGO
eWater specification replacing 30,000L of harsh chemicals a year at the iconic Stokehouse Restaurant
PROJECT
2 YEARS AGO
We all know that sewage, stormwater and wastewater (grey water) cannot flow uphill without being pumped! There are many situations where sewage, stormwater and wastewater can’t be drained away via conventional gravity drainage and must be transferred to a higher point, whether it be to a sewer main at street level, stormwater pipe, easement etc.
PROJECT
2 YEARS AGO
Urban + Fountains & Furniture explains the Benefits of Specifying Sustainable Products in Landscape Projects and why sustainable products are needed in the Australian construction industry.
PROJECT
2 YEARS AGO
Located in the in the new Circular Quay tower, Cora’s design team was able to work within a variety of challenging spaces to meet the client’s requirements and showcase innovative bike parking solutions - including Australia's only fully dynamic upper and lower tier bike parking system (E3DT-GP).